GUIDE TO RISK
ASSESSMENT
**New Edition available NOW**
It
is now ten years since the first Guide to Risk Assessment
was published by the Technical Committee of the Water
Management Society.
Since that time, members of the Technical Committee
have collectively undertaken numerous risk assessment
surveys across a wide range of buildings and water
systems.
Their accumulated knowledge together with additional
input from the Health & Safety Executive has been
utilised in this revision of the Guidance.
The Code of Conduct Association committee has studied
the training requirements for Service Providers. Inspection
of the CCA matrix for training indicates that nothing
short of the complete spectrum of modules that are listed
will prove sufficient for the high standards expected
in the current times.
The revised Guidance not only encompasses updated site
survey details but has been considerably expanded to
cover additional items such as record keeping, written
control schemes, schematic drawings and risk statement
summaries.
If you are involved in risk assessments of building
water systems this revised Guidance is an essential
tool that you should consult at every stage - but remember,
it is GUIDANCE - it does not ultimately dictate how
you must conduct your own individual assessments.